The ground floor is
And again, a floor made it. The ground floor is the ceiling on it. Now you can go to the floor.
But first things first:
In the last two weeks, the walls of the ground floor were built of sand-lime bricks. Then another half-finished filigree ceiling was whacked in head, followed by a few steel braces and everything came back on it concrete. As simple as it can be to build a house. could
Now that the ground floor is ready to move really fast already. The walls and ceiling are also on it. But everything is good, right? Well, the windows are missing and which can be uncomfortable even at these temperatures. In addition, there are quite a lot of fences around everywhere with even more bars, the Everything looks a bit like in prison. So we just wait on something else. Who wants to live behind bars already?
meantime, we have been given a construction schedule. Unfortunately, all my requests not successful, but our building supervisor was lucky. The result is a hand written plan which indicates what should be built and when. So if all goes as planned, it actually manages NCC until Christmas to get the house tight. We are excited and hope for good weather.
For our recently appointed Sonderwüsche we also got a bill immediately. NCC can therefore be very fast. It would be nice if in other Situations would be the case.
Then I was this week still in Badstudio (Bear & Olle Roth KG) to give me time to get an idea of what is in the standard expected and it looks like. Provided KERAMG Alia Paris. This series I could not be shown, but something similar. A similar budget and design line seem to have all the major manufacturers. Real nice, the products are not, but we had previously been suspected. Now we wait for the pricing for the alternatives. Unfortunately, this is a bit difficult. The price could not tell me there. In Badstudio me only the studio rates were mentioned, but the price charged by the installer and then what NCC NCC make of it, that we know until we get the offer from NCC. It's all very complicated everything. But if it does not fit we'll just have to go back there. If the construction companies prefer this method expensive, they have to live with the fact that they face several times.
Then we wanted to make some changes to the arrangement of the sanitary objects. Although I have spoken to NCC on the subject of bathroom equipment and asked for the transfer prices of the standard have to have a basis of comparison in Badstudio, NCC has failed to give me the installation plan. Also Badstudio had us in the appointment underlined the need of this plan, there was only the plan requires. So I was able to explain our ideas and now has roughly what it will wait. After all, wanted to try this at NCC Badstudio itself to the necessary plans. We are so excited
how to proceed with the bath and of course with the construction progress. From Monday, it was supposed to start with the walls of the floor. The "fundamentals" of this are already available and the weather forecast makes hope.
Regards
the construction Reported