Monday, September 27, 2010

I Get Sores On Lip From Chapstick

Construction

Now it is finally, on Wednesday (September 22, 2010) has begun the earthworks. The trench is dug, then where will give the basement.

Unfortunately also this time not active NCC announced the start of construction, we had to ask again. That is very unfortunate, but it will be for many NCC customers the first and only house, which they build. Then you could at NCC on such important dates minimum point.

We now hope for good weather because if it rains too much, first, the excavation will be a pool, and second, the bottom plate is not as well built. But as much as in recent days, it can not actually raining on. Therefore we are optimistic that it may soon move on. And then we can surprise us again by NCC when we look at the construction site according to the state of things.

a "problem" remains to be seen: the sand from our pit is used to backfill the excavation of another house. What is then really our excavation? We keep around our house a ditch, a kind of moat? Then should I order from the special order list perhaps the bascule bridge and the roller door ;-). And what does this actually digging or is it a gift from NCC?

I'll stop by again in the next few days, a swim in our basement and dive for the bottom plate.

Saturday, September 25, 2010

Letters Of Reconsideration Law School

Falk logistics management operation relocation of the company Batra GmbH of Traben Trarbach controls to Düren

The printing Batra GmbH moved this month to your place of business of Traben Trarbach to Düren.

The whole moving logistics by Falk logistics management was planned, executed and monitored. Moved, all printing and converting machinery, paper and material stock, including heavy duty racks, archives, offices, spaces, workshop and industrial vehicles. In addition, all mechanical disassembly and reassembly, including the electric, included in the planning.

Responsible was the company Zoeller Transport GmbH in Frankfurt, including the relocation shipping Frey & Klein Ohlweiler / Simmer the implementation of all additional services rendered. The company Zoeller stated the de-and reassembly of the printing machines and other technical devices.
The project and logistics planning, Mr. Andrew Falk.