The basement is formed
Now it is therefore more directly. On the finished floor slab, the prefabricated basement walls have been set. The partitions that separate the individual houses have been bricked then. Between the respective inner walls of an insulating layer was introduced.
coming this week then hopefully after that, the filigree ceiling, the columns are already and then the ceiling and the walls are filled with concrete. Then have the edges are sealed or waterproof. And then still ran the insulation.
So there is still some way to go until it can be started with the actual construction. NCC has but the goal until the winter the house so far to have done, that the shell is complete and "everything" is. Could then be worked further inside in bad weather and low temperatures. But we are still far away. Now have to scrap the basement are finished.
Good to see in the photographs are also the larger basement windows, which we chose from the special requests at NCC. In this way we hope to more air and light in the basement.
We will this week with the commissioning of the first special needs deal. This will be a costly affair. I will tell the tale. Of course I'll keep an eye on the progress, just like the weather report.
White Christmas in 2010? Only when the shell is up to that! NCC So it's up to you to bring the Berlin a beautiful and idyllic hard :-)
the construction Reported